# Managing Your Own Renovation: Tips for Being Your Own General Contractor
# Managing Your Own Renovation: Tips for Being Your Own General Contractor
Being your own general contractor can save 15-25% on a renovation. But it requires time, knowledge, and willingness to deal with problems. Here's a realistic look at what's involved.
## What a General Contractor Does
### Project Management
- Overall project planning and scheduling
- Coordinating multiple trades
- Sequencing work properly
- Handling delays and problems
- Quality control and inspections
### Administration
- Obtaining permits
- Scheduling inspections
- Managing contracts with trades
- Handling payments
- Insurance and liability
- Documentation
### Problem Solving
- Dealing with unexpected issues
- Making quick decisions
- Mediating between trades
- Finding solutions when things go wrong
## Can You Do It Yourself?
### Good Candidates
- Significant construction knowledge
- Strong organizational skills
- Flexible schedule/available during work hours
- Good communication skills
- Comfortable with confrontation when needed
- Previous renovation experience
- Patient and detail-oriented
### Not Ideal For
- Full-time demanding job
- No construction knowledge
- First major renovation
- Complex projects
- Tight timelines
- Low stress tolerance
### The Honest Assessment
**Time required:** 10-30+ hours per week during active construction.
**Knowledge required:** Understanding of building codes, proper sequencing, quality standards.
**Risk:** Mistakes can cost more than GC savings.
## Projects Suitable for Self-Management
### Good DIY GC Projects
- Bathroom renovation (single trade coordination)
- Kitchen cosmetic update
- Basement finish (straightforward scope)
- Deck construction
- Single-room renovation
### Better with Professional GC
- Whole-house renovation
- Additions
- Structural work
- Projects with tight timelines
- Complex mechanical coordination
## Getting Organized
### Before Starting
**Create project plan:**
- Detailed scope of work
- Sequence of trades needed
- Timeline expectations
- Budget breakdown
- Decision deadlines
**Gather information:**
- Permit requirements
- Code requirements
- Material lead times
- Trade availability
### Documentation System
**Track everything:**
- Contracts with each trade
- Invoices and payments
- Change orders
- Inspection records
- Communications
- Photos of progress
**Digital tools:**
- Spreadsheet for budget tracking
- Shared folder for documents
- Calendar for scheduling
- Notes for decisions and changes
## Finding and Managing Trades
### Finding Quality Tradespeople
**Sources:**
- Referrals from completed projects
- Other tradespeople's recommendations
- Building suppliers
- Online reviews (verify)
**Avoid:**
- Lowest bidder without verification
- No references available
- Cash-only, no documentation
### What to Verify
- License where required
- Insurance (liability and workers' comp)
- References from similar work
- Availability for your timeline
### Getting Quotes
**Provide:**
- Detailed scope of work
- Plans and specifications
- Timeline requirements
- Site access information
**Get:**
- Itemized quote
- Timeline for their portion
- What's included/excluded
- Payment terms
### Contracts with Trades
**Include:**
- Detailed scope of work
- Price and payment schedule
- Timeline with milestones
- Material specifications
- Warranty terms
- How changes handled
- Insurance requirements
## Sequencing Work Properly
### General Sequence
1. **Permits obtained**
2. **Demo and structural**
3. **Rough mechanical**
- Plumbing
- Electrical
- HVAC
4. **Inspections**
5. **Insulation**
6. **Drywall**
7. **Finish carpentry**
8. **Painting**
9. **Flooring**
10. **Finish mechanical**
- Fixtures
- Outlets/switches
- Trim out
11. **Final inspections**
12. **Punch list**
### Critical Coordination
**Before drywall:**
- All rough-in complete
- All inspections passed
- Any insulation complete
- Low-voltage wiring (network, speaker wire)
**Before flooring:**
- Painting complete (or nearly)
- Ceiling work complete
- Base cabinets set (in kitchen)
**Before fixtures:**
- Painting complete
- Flooring complete
- Vanities/cabinets set
## Handling Permits and Inspections
### Permit Responsibility
As "owner-builder":
- You obtain permits in your name
- You're responsible for code compliance
- You schedule inspections
- You're liable for work
### Scheduling Inspections
- Know what inspections are required
- Schedule at proper points
- Be present for inspections
- Address any failures before proceeding
- Get documentation of passed inspections
## Common Problems and Solutions
### Schedule Conflicts
**Problem:** Trade not available when needed.
**Solutions:**
- Build buffer into schedule
- Have backup trades identified
- Communicate early and often
- Be flexible when possible
### Quality Issues
**Problem:** Work doesn't meet standards.
**Solutions:**
- Clear specifications upfront
- Inspect before payment
- Document issues immediately
- Address before next phase
- Hold payment until resolved
### Cost Overruns
**Problem:** Exceeding budget.
**Solutions:**
- Detailed budget with contingency
- Track costs throughout
- Approve all extras before proceeding
- Value engineer if needed
- Make decisions, don't defer
### Discovery Issues
**Problem:** Hidden problems found during work.
**Solutions:**
- Expect the unexpected
- Get assessment quickly
- Understand options and costs
- Make decisions promptly
- Document everything
## Financial Management
### Payment Best Practices
- Never pay ahead of work
- Milestone-based payments
- Hold 10% until completion
- Get lien waivers on larger projects
- Document all payments
### Tracking Costs
**Track:**
- Payments to each trade
- Material purchases
- Permit fees
- Unexpected costs
- Running total vs. budget
**Review:**
- Weekly during active construction
- Before each major phase
- Before final payment
## Insurance Considerations
### Your Homeowner's Policy
- Notify insurer of renovation
- Verify coverage for construction
- May need builder's risk policy
- Understand liability during construction
### Trade Insurance
- Verify each trade has liability insurance
- Request certificates naming you as additional insured
- Verify workers' compensation coverage
- Keep copies of all certificates
## Realistic Time Investment
### Before Construction
- Design and planning: 20-40 hours
- Getting quotes: 15-30 hours
- Permits and preparation: 10-20 hours
### During Construction
- Daily coordination: 1-2 hours/day
- Site visits: 1-2 hours/day
- Problem solving: Varies
- Decision making: Ongoing
### Total Time
**Small project:** 50-100 hours total
**Medium project:** 150-300 hours total
**Large project:** 300-500+ hours total
## When to Call for Help
### Get Professional Help If:
- Multiple serious problems arise
- You're losing control of schedule
- Budget is spiraling
- Quality is suffering
- Stress is affecting life
- Project is stalled
### Options:
- Hire GC to take over
- Hire consultant to advise
- Construction manager (by-the-hour help)
## The Bottom Line
Self-managing a renovation can work well if:
- Right project complexity
- You have time and knowledge
- Good organization and communication
- Realistic expectations
- Backup plan if it gets hard
The savings are real, but so is the work. Go in with eyes open.
The Bottom Line
Contact us to discuss your renovation project. We're happy to answer any questions you have.